Sheet 00General arrangementNot to scale
The termite , drawn in section
Cut a new house through its slab and the termite barrier is a line on the drawing: under the concrete, around its edge, around the pipes that pass through it. The building code calls the whole arrangement a termite management system. Its job is to cut the risk of termites reaching the main parts of a building by a hidden route; it does not stop termites being active on the site.
A guide to termite barriers in plain words, published by Dotto from the official sources listed at the foot of each page: the National Construction Code, the Queensland Building and Construction Commission (QBCC), the Australian Pesticides and Veterinary Medicines Authority (APVMA) and state government guidance.
One drawing, five questions
Each number on the drawing below is a sheet of this guide. Most of the rules are national. Where a state or territory changes one, the sheet says which.
- What the building code requires
Part 3.4 of the code: when a building needs a termite management system, and what that system has to be.
- The durable notice
The notice fixed to the building, usually in the meter box: what the code says it must record, and how to read each line of it.
- Physical and chemical barriers
Mesh, graded stone and treated soil: how each one works, and where each one is weakest.
- Termiticides and the APVMA
How termite chemicals are registered, who controls their use, and the regulator’s 2024 decision on chlorpyrifos.
- Keeping a barrier working
Queensland’s list of what owners should and should not do, reproduced whole, with its clearances drawn.
The four documents behind every barrier
The title block in the corner of a drawing says what the drawing answers to. For a termite barrier there are four documents, and every sheet of this guide comes back to them.
- The code
- NCC Housing Provisions, Part 3.4Termite risk management: the national rules for when a Class 1 or 10 building, such as a house or a private garage, needs a termite management system, and what it must be.
- The standard
- AS 3660.1Termite Management, New Building Work. The code references it, and it is one of a trilogy: Part 2 deals with existing buildings and Part 3 with assessing termite management systems.
- The notice
- Clause 3.4.3A durable notice, permanently fixed to the building in a prominent location such as the meter box.
- The register
- The pesticides registerWhere a chemical system is used, the chemical must be on it. The APVMA currently coordinates the registration scheme.
QBCC’s booklet notes that the Australian Standards it mentions can be purchased, so this guide works from the code and from official summaries of the standards.
Why the code asks for a system, not a wall
There are more than 350 species of termites in Australia, and about 30 of them cause costly damage to building structures, the code’s explanatory note says. It adds that, because of the nature of termites, it is extremely difficult to stop them gaining access to a building.
The risk depends on the place. The same note says termites are not considered a risk in Tasmania and are a lesser risk in parts of Victoria, and that the appropriate authority may have records of termite activity for each area.
The ways in are small. QBCC lists wall cavities, cracks in mortar or concrete slabs, and the voids beside service entry points. A termite management system is designed to block those hidden routes and push termites into the open, where their mud tunnels are easier to spot, the Victorian Building Authority explains.
That is why the code’s note puts so much weight on what happens after the builder leaves: besides correct installation, a system’s effectiveness relies on regular maintenance and competent inspection.